Traffic Analysis for WBS_BojongKoneng37A - SMKN 5 Bandung
| System: | olt-huawei-pas |
| Customer: | WBS_BojongKoneng37A - SMKN 5 Bandung |
The statistics were last updated Saturday, 6 December 2025 at 13:42,
at which time 'OLT-HUAWEI-PASKAL' had been up for 56 days, 2:29:20.
`Daily' Graph (5 Minute Average)
|
Max |
Average |
Current |
| In |
67.8 Mb/s (3.8%) |
13.5 Mb/s (0.8%) |
15.9 Mb/s (0.9%) |
| Out |
31.0 Mb/s (1.7%) |
3133.5 kb/s (0.2%) |
1097.8 kb/s (0.1%) |
`Weekly' Graph (30 Minute Average)
|
Max |
Average |
Current |
| In |
61.2 Mb/s (3.4%) |
12.1 Mb/s (0.7%) |
11.3 Mb/s (0.6%) |
| Out |
30.5 Mb/s (1.7%) |
2079.4 kb/s (0.1%) |
3416.9 kb/s (0.2%) |
`Monthly' Graph (2 Hour Average)
|
Max |
Average |
Current |
| In |
69.1 Mb/s (3.8%) |
15.1 Mb/s (0.8%) |
20.2 Mb/s (1.1%) |
| Out |
21.7 Mb/s (1.2%) |
2157.4 kb/s (0.1%) |
7179.4 kb/s (0.4%) |
`Yearly' Graph (1 Day Average)
|
Max |
Average |
Current |
| In |
27.5 Mb/s (1.5%) |
14.3 Mb/s (0.8%) |
14.6 Mb/s (0.8%) |
| Out |
6248.2 kb/s (0.3%) |
1931.0 kb/s (0.1%) |
3189.5 kb/s (0.2%) |
| GREEN ### |
Incoming Traffic in Bits per Second |
| BLUE ### |
Outgoing Traffic in Bits per Second |